Early and Support Works

Established in 1989, our Teesside region quickly established a reputation for delivering high-quality projects focused predominantly around civil engineering and building works.

The office has major industrial clients including: the former ICI, British Steel and Air Products, with whom we delivered our largest project to date, a civil engineering and building package worth £54m on the Tees Valley energy from waste plant.

We continue to deliver excellence in our core sectors and have diversified with expertise in commercial, retail and medical projects, completing over 20 medical centres to date.

Supply personnel and equipment to carry out remediation works to contaminated areas.

Supply excavators and dump trucks with operators to carry out earthworks and site preparation works. Supply personnel and equipment to carry out demolition of existing structures, including the removal of asbestos. (Note: Reuben Smith appointed Safe Strip as their asbestos removal contractor).

Supply personnel and equipment to carry out removal of redundant fire main.

Contract placed 10/12/2016

Supply personnel and equipment for the jointing/extension and testing of existing 11KV electric cable.

Supply personnel for site security.

Supply personnel and equipment for saw cutting existing roads / slabs.

Supply all necessary personnel and plant for pipeline jetting and waste disposal of materials from existing structures.

Contract placed 12/01/2016

Supply personnel and equipment to undertake plate load compaction and sand replacement tests. Also to undertake drilling for trial hole.

Contract placed 03/02/2017

Manufacture, supply and install chainlink & palisade fencing and gates.

Contract placed 03/07/2017

Supply of site engineer services

Contract placed 03/09/2017

Supply personnel and equipment to undertake survey of the existing culvert.

Supply personnel and equipment to install earthing point and 2 number monitoring points on site.

Design, install, test and commission electrical (including IT) works to MGT temporary facilities.

Design, installation and testing of water supply to MGT temporary facilities.